题目内容

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.空白(2)处应选择()

A. activity
B. procedure
C. process
D. progress

查看答案
更多问题

客船一般每()作一次救生演习,货船和其它船()个月作一次救生演习。

下列关于社会保险的说法错误的是()。

A. 国家或政府往往通过立法形式实施社会保险
B. 公民或劳动者可自己决定是否参加社会保险
C. 社会保险只针对某些社会特定风险承保
D. 社会保险只针对基本生活需要提供经济保障

空间力偶矩是()。

A. 代数量
B. 滑动矢量
C. 定位矢量
D. 自由矢量

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.空白(1)处应选择()

A. customers
B. managers
C. users
D. administrators

答案查题题库