题目内容

A.OnB.ByC.AtD.From

A. On
By
C. At
D. From

查看答案
更多问题

A.He turned suddenly and ran into a tree.B.He was hit by a fallen box from a truck.C.H

A. He turned suddenly and ran into a tree.
B. He was hit by a fallen box from a truck.
C. He drove too fast and crashed into a truck.
D. He was trying to overtake the truck ahead of him.

A.needsB.notionsC.motionD.blows

A. needs
B. notions
C. motion
D. blows

某建设项目各年的现金流人量和流出量如下表所示.则该项目的动态投资回收期为 ()年。

A. 5.63
B. 6.63
C. 7.63
D. 8.63

已知某建设项目社会折现率为6%时,项目的经济净效益为12万元,社会折现率为 7%时,经济净效益为-8万元,则该项目的经济内部收益率为()。

A. 0.066
B. 0.065
C. 0.064
D. 0.063

答案查题题库